Work included construction of a new 700 space parking lot, access road and pedestrian tunnel.  The development of a 30 acre site included 30,000 cubic yards of earth excavation, access road construction, asphalt parking lot, concrete curbs, sidewalks, site lighting and landscaping.  ADA accessibility to the Metra Station included the construction of a pedestrian tunnel under the tracks with accessible ramps.